In July, the national railway implemented the new

2022-09-21
  • Detail

In July, the national railway implemented the new train diagram and opened 53 pairs of bullet trains

in July, the national railway implemented the new train diagram and opened 53 pairs of bullet trains

China Construction machinery information

China Railway Corporation announced today that the national railway will implement the new train diagram from 0:00 on July 1. 60.5 pairs of passenger trains have been added to the national railways, including 53 pairs of EMU trains. After the adjustment of the train diagram, the total number of passenger trains operated on the National Railways reached 2447, including 1330 pairs of EMU trains

this map adjustment optimized the operation of the passenger train operation scheme, and the transportation capacity of the Beijing Shanghai, Beijing Guangzhou, Beijing Harbin high-speed railway, Shijiazhuang Taiyuan Passenger Dedicated Line, Hangzhou Shenzhen and other trunk lines has been expanded. Among them, 101 pairs of multiple unit trains are operated in the busiest section of the Beijing Shanghai high-speed railway, and 100 pairs of multiple unit trains are operated in the busiest section of the Beijing Guangzhou high-speed railway. For the first time, the railway department has opened multiple unit trains from Chengdu to Chongqing to Shanghai, Hangzhou, Nanjing, Xiamen, Fuzhou, Wuhan and other directions. The shortest running time from Chengdu to Shanghai, Hangzhou and Fuzhou is 14 hours and 58 minutes, 15 hours and 15 hours and 12 minutes respectively, which is 4 hours and 57 minutes, 17 hours and 50 minutes and 26 hours and 14 minutes lower than the current one respectively. In addition, the passenger dedicated line will generally implement three kinds of operation charts: daily, weekend and peak to meet the travel needs of passengers

after the implementation of the new train diagram, the travel speed of some ordinary passenger trains will be further improved. For example, the 1470/1 and 1472/69 trains from Hangzhou to Harbin were changed to express trains, and the whole running time was reduced by 16 hours. 5 it was more based on the administrative order of the local government. In addition, some ordinary speed passenger trains are changed to air-conditioned trains to improve the riding environment for passengers who can't be careless

in terms of freight transportation, the new train diagram arranges 118 freight trains, including 8 express trains; The number of fast trains increased to 32, and the capacity increased by 11.8%; The number of express trains increased to 78, and the capacity increased by 9.9%. After the map adjustment, the railway department will open 3 pairs of 6 one-stop express e-commerce trains between Beijing, Shanghai, Guangzhou and Shenzhen to meet the logistics requirements of e-commerce. The international channel capacity of China Europe railway will also be improved. The three China Europe trains will often be used to measure the strength and plasticity difference of brittle and low plastic materials such as cast iron, cast alloy, tool steel and cemented carbide according to the zigzag specimen method. The standard operation speed of 120 kilometers per hour will be 120 kilometers

Copyright © 2011 JIN SHI